The CHALLENGE

We were specially recommended to come in and salvage this project in which a rogue builder nearly destroyed both the project and the confidence levels in which our client had in builders in general. The house required a total overhaul from top to bottom. With the exception of the floorboards and joists, the entire house needed to be gutted and re-built in every area.

The SOLUTION

A full turnkey services of works was commissioned; New ceilings were installed and plastered throughout. Old plaster was hacked off of all walls back to the original brickwork and re-plastered. New central heating system, plumbing and electrical services were installed throughout. New doors and timber work. New A Grade double glazed windows installed. Very modern and contemporary kitchen and bathroom suite was added offering lots of light and space. Solid wooden flooring was installed to the ground floor of the house, with warm thick pile carpet to the staircase and first floor of the house.

The RESULT

A vast amount of hand holding was done with our client aligned with a detailed and precise full project management service throughout, resulting in the project being completed ahead of schedule and to budget, thus allowing our client to sell at the peak of the market and earn substantial profit on their investment.